ACCESS ROAD AND PAD PROJECT
The photos above represent an access road and pad project that IronHorse Unlimited (IHU) was contracted to build. IHU cleared, graded and rocked over 4 miles of access road and a 400′ x 285′ pad. Approximately 14,500 tons of rock was excavated onsite, and trucked approximately 12 miles on a private road which went through the south end of Palo Duro Canyon. The location included a double horseshoe reserve pit, and a 6’x10′ deep cellar.